
Playground Cleaning
Safety surfacing and play equipment cleaned at low pressure, so slip resistance comes back without the surface being damaged.
Family-run
Justin and the team do the work. No call centres, no subcontractors.
Fully insured
Full public liability cover on every job, domestic or commercial.
Safe methods
Biodegradable products and low pressure, matched to the surface.
Free quotes
No obligation, and no charge for coming out to look at the job.
What playground cleaning actually involves
Playground cleaning is the removal of algae, moss and biological growth from safety surfacing and play equipment using low pressure methods that leave the surface itself intact. The point of it is slip resistance. Wet pour, artificial grass, timber and painted metal all become slippery once a film of algae builds up in the texture, and that film needs killing at the root rather than simply blasting off the top.
Playground cleaning is a safety job that happens to look like a cleaning job. Wet pour rubber, artificial grass and painted steelwork all develop a thin biological film in a wet climate, and that film is what makes a surface slippery underfoot. It is rarely obvious as dirt. A wet pour surface can look perfectly acceptable from the staff room window and still be slick, because the algae is sitting down in the texture where nobody is looking.
Wet pour is rubber crumb bound with polyurethane and laid to a depth set by the fall height of the equipment above it. It is porous by design, so water passes through and drains away. Once moss and algae close those pores, water sits on top instead, the surface stays wet for days after rain and the drainage the designer relied on stops doing its job. High pressure clears the growth and tears the binder at the same time, so we do not use it.
We work around the site rather than expecting the site to work around us. Most school and nursery work is booked into half terms, holidays or before the gates open, and parish council play areas are usually done early so the space is back in use by mid morning. Tell us your safeguarding and site requirements when you ask for a quote, including sign in, ID and where we can park, and we will have them sorted before we arrive.
Suitable for
- Primary school and nursery playgrounds and early years areas
- Wet pour rubber safety surfacing and rubber mulch
- Artificial grass play areas and sports surfaces
- Climbing frames, trim trails, timber equipment and steel frames
- Parish and town council play areas and recreation grounds
- MUGA courts, playground markings and outdoor classroom areas
Problems it solves
- Safety surfacing that has turned slippery underfoot after rain
- Wet pour holding standing water because the pores have clogged with moss
- Artificial grass gone green and matted with moss through the pile
- Bird fouling and general contamination on equipment children touch
- Playground markings faded under a layer of algae rather than worn out
- Timber and steel play equipment looking neglected at open days and inspections
How we approach playground cleaning
Site visit and method
We look at the surfacing type, its condition and where water is sitting, then agree access, timing and your site rules. Any damaged or lifting wet pour is flagged to you before cleaning rather than after.
Clear and cordon
Loose litter, leaf debris and bark are cleared, the working area is cordoned off from the rest of the site, and drainage points are checked so the run off has somewhere sensible to go.
Treat the growth
A biodegradable biocide is applied at low pressure and left to work. It kills algae, moss and lichen at the root, which is what stops the film returning within weeks of the visit.
Agitate and lift
Moss is brushed and lifted out of the surface texture, and artificial grass is worked through the pile rather than blasted, so the infill stays where it belongs and the fibres are not damaged.
Rinse and reopen the drainage
The surface is rinsed at low pressure so the pores in wet pour and the perforations in artificial grass drain freely again. Equipment, frames and handrails are wiped down as part of the same visit.
Handover
We walk the area with your site manager, confirm when it is safe to reopen and flag anything we noticed that needs a repair contractor rather than a cleaner, such as split seams or exposed edging.
What you get
- Slip resistance restored, which is the actual reason the job gets done
- Wet pour porosity reopened, so water drains instead of standing
- No high pressure, so binder, infill and fibres are left intact
- Work scheduled around term dates, holidays and opening hours
- Fully insured, family-run, and no subcontractors on your site
- Free, no-obligation quotes and a clear method agreed in advance
Playground Cleaning questions
Related services
- SoftwashingLow pressure cleaning with a biodegradable biocide that kills algae, l
- Pressure WashingThe right tool for block paving, concrete and stone flags, and the wro
- Cladding CleaningPanel systems, aluminium and UPVC cleaned by the right method for each
- Patio CleaningAlgae, black spot and moss removed from garden paving using the gentle
Need playground cleaning doing?
Free quotes, no obligation, and an honest answer about whether the job actually needs doing.
